Subsoiler Product Manuals

Subsoiler Maintenance

• Clean the soil and plant residues on the Subsoiler after each ploughing work.

• Before every ploughing work and at the end of every 10 hours of operation, all grease nipples marked with labels on the plough should be greased sufficiently.

• Check the bolts and nuts after each ploughing work; tighten the loose ones, and replace the missing ones with original spare parts suiting to the holes.

• In the seasons when the plough will not work, the plough should be stored in a closed warehouse.

• If the plough will not be used for a long time, all glossy surface should be protected against rust by coating with protective oil or grease.

• Frequently check the plough parts contacting to soil, replace the worn parts with new original ones.

• All grease nipples on the plough should be greased after each work until the clean oil comes out of the bearings.

• While lowering the plough to the ground, do not release it suddenly; it should be lowered slowly and carefully.

NOTE: IN CASE OF A PROBLEM WITH YOUR SUBSOILER, DON’T HESITATE TO ASK FOR HELP IN OUR AUTHORIZED SERVICES …